Renovation Contractor in Oshawa & Durham Region
Whitby currently runs three separate zoning by-laws depending on when your area was developed, and updates on Additional Dwelling Units have changed what's allowed on many lots. We confirm which rules apply to your property before we design anything.
Whitby at a Glance
Before We Design Anything
Whitby currently operates under three separate zoning by-laws — 1784, 2585, and 5581-05 for lands on the Oak Ridges Moraine — depending on when your area was zoned. The Town is combining all three into one updated by-law, but until that's finished, we confirm exactly which one applies to your property.
If your addition includes a basement or a secondary suite, see our legal basement apartment guide for Whitby — the parking and unit-count rules there are separate from what applies to a straight addition or garage.
Building Up
Adding a full floor on top of your existing home isn't just framing walls — it changes the structure underneath it too.
How It Works
An addition isn't just built — it's checked against your specific zoning by-law, engineered, permitted, and inspected. We carry all of it.
We identify which of Whitby's zoning by-laws applies to your property and check setbacks, coverage, and height limits before we design.
Scaled plans plus structural engineering where required — mandatory for any second-storey work.
Filed through Whitby's E-Portal. Standard residential additions typically clear in 4 to 6 weeks; we track it so you don't have to.
Framing, structural, electrical, and plumbing inspections through to final sign-off.
Our on-time guarantee. If we miss the agreed completion date for reasons within our control, you're compensated $300 for every day past it — part of the Certainty Stack on every Cornerstone build.
Why Build It Permitted
A permitted addition shows clean on a title search. An unpermitted one can hold up your sale or force disclosure to buyers.
Unpermitted structural work can void your coverage if something goes wrong down the line — permitted work protects your policy.
The Town can order unpermitted additions removed or brought up to code after the fact. Done right the first time, that risk doesn't exist.
Proper engineering means your addition holds up for decades — not just long enough to pass a first inspection.
Common Questions
Also building additions and garages in Oshawa, Ajax, and across Durham Region.
Start with a free project diagnostic. We'll check your zoning by-law, run the real numbers, and give you a clear, locked price. Built once, built right.
Durham Region's trusted renovation contractor. Led by Mike Brock since 2017. We Listen, We Build, We Deliver.