Renovation Contractor in Oshawa & Durham Region
Pickering updated its building permit fee schedule at the start of 2026, and a lot of the information homeowners find online is already out of date. We confirm current fees, setbacks, and lot coverage rules before we design anything.
Pickering at a Glance
Before We Design Anything
Pickering is in the process of finalizing a new, consolidated Zoning By-law to replace the older by-laws currently governing the city. We confirm which version applies to your property before we design anything, not after.
If your addition includes a basement or a secondary suite, see our legal basement apartment guide for Pickering — the parking and unit-count rules there are separate from what applies to a straight addition or garage.
Building Up
Adding a full floor on top of your existing home isn't just framing walls — it changes the structure underneath it too.
How It Works
An addition isn't just built — it's checked against your zoning, engineered, permitted, and inspected. We carry all of it.
We check setbacks, lot coverage, and whether a preliminary zoning review makes sense for your property before we design.
Scaled plans plus structural engineering where required — mandatory for any second-storey work.
Filed with the City. Typical review runs 4 to 8 weeks; we track it so you don't have to.
Framing, structural, electrical, and plumbing inspections through to final sign-off.
Our on-time guarantee. If we miss the agreed completion date for reasons within our control, you're compensated $300 for every day past it — part of the Certainty Stack on every Cornerstone build.
Why Build It Permitted
A permitted addition shows clean on a title search. An unpermitted one can hold up your sale or force disclosure to buyers.
Unpermitted structural work can void your coverage if something goes wrong down the line — permitted work protects your policy.
The City can order unpermitted additions removed or brought up to code after the fact. Done right the first time, that risk doesn't exist.
Proper engineering means your addition holds up for decades — not just long enough to pass a first inspection.
Common Questions
Also building additions and garages in Ajax, Whitby, and across Durham Region.
Start with a free project diagnostic. We'll check your zoning and current fees, run the real numbers, and give you a clear, locked price. Built once, built right.
Durham Region's trusted renovation contractor. Led by Mike Brock since 2017. We Listen, We Build, We Deliver.